What can we help you with?
Keeping Pipe Organs Alive
- Providing technical services since 1999
- Manufacturer-independent assessment and recommendations
- Tuning, maintenance, repair, restoration, rebuilding and installation
- Expertise across pipework, wind systems, windchests, consoles and control systems
- A direct W-2 workforce for primary service, with third-party specialists used in collaboration with customers when unique projects require additional domain expertise
- In-house apprenticeship program for developing the next generation of pipe-organ technicians
- Written findings, work records and closeout documentation to support long-term continuity of instrument care
- Flat monthly billing programs offered for recurring tuning and maintenance
- National service coverage and long-term care relationships
Phone: +1 (888) 561-9121
What Happens During a Pipe Organ Relocation
A pipe organ relocation is a staged project, not a single move. The instrument is documented before anything is taken apart, dismantled with each part labeled and packed, rigged out of the building and transported, often by way of a workshop, then reassembled in a receiving building that has been prepared for it, and finally given the post-installation tonal regulation that fits its sound to the new room. The Organ Clearing House, describing its own process, runs the sequence from setting possibilities and a budget, through a specification suited to the space, visits to play and hear instruments and a negotiated sale, to dismantling, transport to its workshop, site preparation, and installation, voicing and tuning in place. Each stage depends on the one before it, and the stage that makes the rest possible is the record made before dismantling.
Whether a particular instrument should be moved at all is a separate decision, answered on Evaluating, Relocating, and Adapting a Used Pipe Organ. This page assumes that decision has been made and describes what the project then involves: what is recorded, how parts are identified and protected, who does the physical removal, what the receiving building needs, how the project ends, and why published statements about cost disagree.
The shape of a relocation
The named stages
The Organ Clearing House publishes the fullest staged description of a relocation available from a firm that does the work: possibilities and budget, a specification for an instrument suited to the space, visits to play and hear instruments, negotiating a sale, dismantling and transport to the firm’s workshop, site preparation in the receiving building, and finally transport, installation, voicing and tuning in place. That is one firm’s account of its own way of working, and it says little about how an instrument is documented before dismantling, how pipework is packed, or how it is stored between buildings. Those stages are covered below because they decide whether what arrives can be rebuilt.
Buzard Pipe Organ Builders, which states that its restoration projects follow the guidelines of the Organ Historical Society, describes the work this way: ‘Disassembling, moving, and reassembling an organ requires strict attention to detail, gentle handling, and sensitivity to both the new location and the many other parties involved.’ The parties are the point. A relocation involves the seller, the buyer, the organbuilder, the crew that rigs and moves the instrument, the receiving building’s own contractors, and, where church or heritage guidance applies, the body that issues it. The stages exist so that each party hands the instrument to the next in a known state.
What has to be settled before work starts
Scope is settled before the instrument is touched. Létourneau’s published description of its relocation service states that the client must decide, before relocation begins, which modifications, minor or major, suit their needs and whether restorative repairs are necessary. That decision fixes what goes to the workshop, what is done there, and what the receiving building must provide, and it is framed by the firm as the client’s choice within the service it offers rather than as a required sequence or minimum scope.
Before that choice, the suitability of the instrument for the move and for the new room is assessed. That assessment is its own decision, with its own page linked above, and this page does not make it.
Craftsman Pipe Organs offers documentation, rigging, relocation and installation among its services, delivered through its direct workforce with outside domain expertise brought in case by case when required and disclosed to the customer. The exact scope, the performing party for each part of the work, and the licensing, engineering, permitting, parts and treatment decisions are project-specific and are controlled by the accepted written documents, not by this page. How a relocation sits alongside room, climate, electrical and construction-protection planning is set out on Pipe Organ Installation and Relocation Planning.
Before anything is taken apart
The full report before dismantling
A full report of the organ is made before it is dismantled. Church of England guidance for parishes, issued under the faculty jurisdiction that applies to its buildings in England, recommends making a full report of an organ before dismantling it where relocation is being considered. The Pipe Organ Conservation and Maintenance Guide published in 1998 by NSW Heritage and the Organ Historical Trust of Australia requires thorough, detailed documentation of an organ before dismantling for any major repair, restoration or reconstruction, together with work programs and written reports recording all procedures and discoveries; it does not prescribe a format or a level of detail.
The American Theatre Organ Society’s restoration guidelines, adopted in 1992 for theatre organs, direct restorers to keep detailed records, measurements and photographs during the course of the work and to submit copies to the Society when possible, so that the evidence recovered during dismantling is not lost with the project. The three bodies write for different instruments and jurisdictions, and none binds a project outside its own remit. What they share is the sequence: record first, dismantle second.
Why the record is what makes reassembly possible
The pre-dismantling report is the relocation record. In the church and conservation guidance above, the documentation made before an organ is taken apart is not a preliminary to the move; it is the record that travels with the instrument, against which the labeled parts are checked out of one building and back into the next. Records, measurements and photographs of the instrument as it stood, and written notes of what was found as it came apart, give the reinstalling crew what the old building itself can no longer show them.
Published guidance of this kind does not replace inspection and assessment of the actual instrument and the actual building. What the guidance establishes is that the inspection happens, and is written down, before anything is dismantled.
Dismantling, labeling and packing
Identifying what comes out
Parts that come out are labeled back to the record made before dismantling. The American Theatre Organ Society’s guidelines state that original parts which are removed or modified should be carefully packed, stored in a safe part of the building, and properly labeled as to their significance. The guidance is written for theatre organs, but the purpose carries: a label ties a pipe, a windchest, an action component or a length of casework to its place in the pre-dismantling report, so that reassembly is a matter of reading rather than guessing.
Dismantling itself is technician work and no sequence is given here. What an owner can judge from a proposal is whether it describes labeling and packing at all, and whether it ties them to a record made first.
Packing and storing pipework
Pipework is packed so that pipes do not touch each other. John Bishop, writing in The Diapason in March 2025, states that when pipes are packed no two pipes may touch directly, because contact scratches them in transport. The materials, crate sizes and handling of soft-metal pipes are specialist matters and this page gives no procedure for them; the principle is stated so that an owner can recognize competent packing when a proposal describes it.
Between buildings the instrument may sit in storage for a long time. The theatre-organ guidance above places removed parts in a safe part of the building; where the parts leave the building, storage is arranged as a stage of the move, and the Organ Clearing House lists storage arrangement among the services it offers. The labels and the record are what survive a long storage interval intact.
Rigging and transport
What removal physically involves
The largest parts of a pipe organ are heavy, long and awkward, and the route out of the building can govern the risk more than the packing does. John Bishop records, in the same March 2025 column, that 16-foot Diapason pipes weighing about 500 pounds, which he notes are actually closer to eighteen feet long, had to be maneuvered down flights of twenty-four stairs with corners in the stairways during one organ removal. That is a single project, but it shows what a removal crew is actually contending with, and why the access route is walked and planned before a pipe is lifted.
No rigging, lifting or structural method is given here. How a given instrument is taken out of a given building is decided on site by the people responsible for it.
Why this is separately resourced and insured
Rigging and transport are treated in the published guidance as their own activity within the move, with their own crew and their own insurance question. The Associated Pipe Organ Builders of America, in a July 2023 answer on selling a pipe organ, states that a congregation removing a pipe organ from a building may wish to consider hiring an insured professional to remove the organ in order to protect the building and its furnishings. The Diapason’s profile of the Organ Clearing House reports that the firm has been involved in the relocation of more than 2,000 pipe organs, that its crew is available for rigging and shipping related to dismantling and installation, and that a specialty is the construction of new organ chambers; the profile is undated and the figure is the firm’s own.
Craftsman Pipe Organs lists rigging among the services it offers, delivered through its direct workforce with outside domain expertise used case by case when required and disclosed to the customer; the performing party for any rigging, and the licensing, permitting and engineering that go with it, are project-specific and fixed in the accepted written documents. Whether a particular removal requires a licensed rigger, an engineer’s involvement, a permit or a specific form of insurance is determined for the reader’s project by the parties and authorities responsible for it, not by this page. Nothing here is a legal, insurance or safety conclusion, and a stated service scope is not by itself evidence that any particular license, permit or authorization is held for a given project.
The workshop interval
Two documented projects
An instrument may go to a workshop between removal and reinstallation rather than moving directly from one building to the next; the Organ Clearing House’s own sequence places dismantling and transport to its workshop before site preparation in the receiving building. Andover Organ Company reports that its Opus R-328 was dismantled in July 1999 and transported to its Lawrence workshop, where 18 employees worked for more than a year before the organ returned to Buffalo in September 2000. That duration reflects a full rebuild and expansion, not a bare relocation, and one project does not set a typical timescale.
For its Opus R-474, Andover reports that an examination in early 2010 produced a detailed inventory of the missing pipes and parts, that the entire organ except its structural frame and case was removed to the shop in January 2011, and that the missing items were subsequently returned to the church. Two things carry over from that account: the inventory came first, and the frame and case stayed in place, which is a scope decision made before the crew arrived. The recovery of missing parts in one project does not imply that dispersed components are usually recoverable.
Preparing the receiving building
What is done before the instrument arrives
The receiving building is prepared before the instrument arrives, not after. Létourneau’s published relocation service describes pre-installation preparatory work it assists with: reconfiguring the destination organ space, including possible steel framing for structural support; specifying electrical requirements for blower connections and power supply; sizing wind lines when the blower will sit remotely from the instrument; and specifying scaffolding and hoisting apparatus for installation. That is a description of a service’s scope rather than of a particular project, and it names the trades a move touches: structure, electrical, and the organ’s own wind system. Whether steel framing or any other structural work is needed for a given building is an engineering determination made for that building, and no structural method is given here.
What the electrical supply to a pipe organ has to provide, and how NEC Article 650 bears on it, is the subject of the electrical-requirements page in this section. How the room’s surfaces and volume shape the organ’s sound, and what can be done about them before the instrument arrives, is covered on the room-acoustics page. Neither question is decided here.
Phased projects
A relocation can be delivered in phases across years, with storage as one of them. Kimball Opus 7133 of 1933, a three-manual instrument of 41 stops, 52 ranks and 3,556 pipes built for the Phipps mansion in Denver, moved to the Phipps Auditorium and then, in 1986, to Midwestern State University in Wichita Falls, Texas, was dismantled for storage by the Organ Clearing House in 2012 and then became a phased installation project at St. Thomas the Apostle Episcopal Church in Houston. The parish’s own 2018 description places ‘updating the console and restoring the main divisions to playing condition’, with ‘extensive re-wiring, reconditioning of winding systems’, in phases three and four.
That account is a fundraising page written while the project was incomplete; the phase descriptions are plans rather than finished work, and the present state of the instrument is not known from it. What the example shows is that storage, reinstallation and restoration can be separate, separately funded stages rather than one continuous move.
Reassembly and finishing
What reinstallation covers
Reinstallation puts the instrument back together and playing in the new room, and it ends before the tonal work begins. John Bishop’s 2022 account of the Gabriel Kney organ relocated to Saint Meinrad records that when he arrived the case was up, the windchests were in place, the action was connected and functioning, and the wind system was complete, and that tonal finishing was carried out afterwards, in May, by Fred Bahr of John-Paul Buzard Pipe Organ Builders. That is one project, and the finisher came from a different firm than the original builder, which the account presents without comment.
The mechanical work ends when the organ plays; the sound work does not. Létourneau states that a relocation is typically completed with post-installation tonal regulation or revoicing to fine-tune the organ’s sound to the new room’s acoustic. Where the line between installing an organ and finishing its tone falls, and what each side of it includes, is set out on Installation Versus Tonal Finishing.
Records handed over
The project closes with the records, not with the last pipe. The 1998 OHTA guide requires written reports recording all procedures and discoveries, and the ATOS guidelines call for records, measurements and photographs kept through the work, with copies deposited with the Society when possible, so that what was learned while the organ was open is not lost. The pre-dismantling report, the labels, the inventory and the reinstallation notes together form the relocation record that the next technician, or the next move, will depend on.
Documentation is part of Craftsman Pipe Organs’ stated offering, with its exact scope controlled by the accepted written documents for the project. If you are planning a move, the first deliverable to ask for is the record, and the first question to settle in writing is who is responsible for each stage.
What a relocation costs
What the published positions actually say
Published statements about the cost of relocating a pipe organ disagree, and each carries its own conditions and date. The Organ Clearing House states that total acquisition expenses for a relocated instrument comprise the purchase price, dismantling, repairs, transportation, installation and building modifications, so that the purchase price is only one component of the cost; the page attaches no figures or proportions to those components. On its fees page the same firm quotes a turn-key range of 500,000 to 1,000,000 US dollars for a full-sized three-manual instrument of about fifty stops, states that a residence organ under a ten-foot ceiling typically costs up to 50,000 US dollars complete, and states that restoration work typically costs two thirds to three quarters that of commissioning a new organ. Its finder’s fee is stated as 3,000 US dollars or 10 percent of the purchase price, whichever is greater.
Those are one firm’s published terms for its own market as of September 2026, undated on the page and revised without notice; they are not a benchmark, and they must not be blended with anyone else’s estimate.
Patrick J. Murphy and Associates state that a relocated organ can represent a substantial saving over the cost of a new instrument depending on the condition of its mechanical systems, and that labor is the primary expense for dismantling, packing and moving the organ; the article is undated and gives no figures. The Diocese of Exeter’s Diocesan Advisory Committee stated in 2016 that the cost of rebuilding a second-hand organ will be fairly substantial because the work is labor intensive, and that where the existing organ is in a poor state it may be best to replace it with a new or second-hand instrument; a 2016 note cannot establish 2026 costs.
Why the figures are kept separate
These positions are not reconciled here because they cannot honestly be. One firm publishes turn-key bands for its own market; a second says a saving is possible and conditions it on the mechanical systems; a diocese says the rebuilding cost is substantial and that a poor instrument may be better replaced. They describe different scopes, different instruments and different years, and averaging them would produce a number that none of the three stands behind. Published bands of this kind are revised by the firms that publish them without notice.
None of these figures is a quotation for any project, and none is a price from Craftsman Pipe Organs, whose scope and price for any relocation are set only in the accepted written documents for that project. What a particular move will cost is known only after the instrument and both buildings have been inspected and the scope has been written down, which is where any serious project starts.
Frequently Asked Questions
A pipe organ relocation runs in stages: scope and budget are settled and the instrument’s suitability assessed; a full report is made before dismantling; parts are labeled and packed; the instrument is rigged out and transported, in the Organ Clearing House’s published sequence to its workshop first; the receiving building is prepared; the organ is reassembled; and it is then regulated or revoiced to the new room, which Létourneau states typically completes a relocation. The sequence is described by named firms about their own process, a particular project may differ, and any firm’s scope for a given move is fixed in its written documents.
A full report of the organ is made before it is dismantled: Church of England guidance recommends a full report before dismantling where relocation is being considered; the 1998 NSW Heritage and Organ Historical Trust of Australia guide requires thorough, detailed documentation before dismantling together with written reports of all procedures and discoveries; and the American Theatre Organ Society’s 1992 guidelines call for detailed records, measurements and photographs during the work, with copies sent to the Society when possible. Each body writes for its own instruments and jurisdiction, and the report is the record against which reassembly is checked.
Pipes are packed so that no two touch each other directly, which John Bishop, writing in The Diapason in March 2025, gives as the rule for preventing scratching in transport; the American Theatre Organ Society’s guidelines state that removed original parts should be carefully packed, stored in a safe part of the building and labeled as to their significance. Handling and crating soft-metal pipework is specialist work and no procedure is given here.
Rigging and transport are done by a crew resourced for that work as its own stage of the move: APOBA’s 2023 guidance says a congregation removing a pipe organ may wish to consider hiring an insured professional to protect the building and its furnishings; The Diapason reports that the Organ Clearing House crew is available for rigging and shipping; and John Bishop’s account of maneuvering 500-pound pipes down twenty-four stairs shows why the access route governs the risk. Craftsman Pipe Organs lists rigging among its services, with outside expertise used case by case and disclosed; who performs the rigging, and what license, permit or insurance it requires, is determined for each project by the responsible parties and authorities, not by this page.
Published positions disagree. Patrick J. Murphy and Associates state that a relocated organ can be a substantial saving over a new instrument depending on the condition of its mechanical systems, with labor the main expense of dismantling, packing and moving; the Organ Clearing House states that total cost includes purchase, dismantling, repairs, transport, installation and building modifications, and publishes a turn-key band of 500,000 to 1,000,000 US dollars for a three-manual instrument of about fifty stops, undated and revised without notice; and the Diocese of Exeter said in 2016 that rebuilding a second-hand organ is fairly substantial in cost and that a poor instrument may be better replaced. None is a quotation, the figures are not reconciled, and the answer for a given instrument depends on its condition and the scope agreed in writing.