What can we help you with?
Keeping Pipe Organs Alive
- Providing technical services since 1999
- Manufacturer-independent assessment and recommendations
- Tuning, maintenance, repair, restoration, rebuilding and installation
- Expertise across pipework, wind systems, windchests, consoles and control systems
- A direct W-2 workforce for primary service, with third-party specialists used in collaboration with customers when unique projects require additional domain expertise
- In-house apprenticeship program for developing the next generation of pipe-organ technicians
- Written findings, work records and closeout documentation to support long-term continuity of instrument care
- Flat monthly billing programs offered for recurring tuning and maintenance
- National service coverage and long-term care relationships
Phone: +1 (888) 561-9121
Comparing Organ-Restoration Proposals
Compare organ-restoration proposals as treatment documents, not as totals. A proposal that can be compared with another describes what work is proposed, why it is required, which methods and materials will be used, which items are essential and which are optional, and what future service the builder offers. Two proposals that answer those questions at the same level of detail can be set side by side; two that do not are answering different questions, and the gap between their totals tells you very little. At Craftsman Pipe Organs, scope and price are fixed by the written project documents for the work that is accepted, not by a preliminary conversation or a range.
This page covers how to compare competing proposals. Reading the condition report that comes before them, and the records a finished project should leave with the owner, are covered by their own pages in the Pipe Organ Restoration and Rebuilding section.
What you are actually comparing
A proposal is a treatment document, not a price
A treatment proposal is one of three separate documents in conservation practice, and it sits in the middle. The Organ Historical Society’s conservation guidelines distinguish an examination report, which records what was found; a treatment proposal, which sets out what is to be done about it; and a treatment report, which records what was actually done. The guidelines recommend that the examination and treatment records be provided to the owner. The National Park Service’s museum handbook draws the same line and describes the proposal as a document that outlines the proposed treatment together with alternative approaches, addresses the problems identified, and states the expected time and cost. That handbook governs museum collections, where a curator approves the proposal before work begins; the approval step does not carry over to a parish, but the description of what a proposal contains does.
What makes two proposals comparable
Two proposals are comparable when each describes its work at the same level. The Institute of British Organ Building’s advice on writing organ reports says the recommendations should describe the proposed work precisely enough for its scope to be understood, explain what is required and why, identify the methods and materials for any proposed alteration, distinguish essential from optional work, indicate urgency and possible project stages, and draw attention to health and safety matters such as access. That advice is written for the builder preparing a report, not as a requirement on any proposal you receive, but it is the checklist: if one proposal identifies its methods and materials and the other does not, the first can be evaluated and the second can only be priced.
Comparison also runs better when every builder starts from the same picture of the instrument. In one documented Minnesota restoration project, a condition and treatment report was prepared before any builder was approached, and a separate Connecticut project record documents instrument visits, a comparison matrix, and a shortlist of three builders. When proposals answer a common starting document, the differences between them are more likely to reflect the builders’ judgment than differences in what each one happened to see.
Why two proposals describe different work
A larger scope can be a professional judgment
A proposal that replaces components another proposal would repair is not necessarily inflating the job; it may reflect a judgment about the instrument’s condition. On the Austin Opus 323 project, the supervising contractor stated that all of the thousands of valves and relays of the manual motors were made new, and that it was simpler to rebuild everything than it would have been to try to repair. That is a project-specific judgment by the firm that performed and described the work, and it does not transfer to another instrument. It does show what a scope difference between proposals can be: a different answer to whether a component is worth repairing.
Lining up two scopes so the difference is visible
The way to make a scope difference visible is to have each proposal separate essential from optional work and state its alternatives. IBO report guidance asks the builder to distinguish essential from optional work, urgency and possible stages, and the National Park Service describes a treatment proposal as including alternative approaches. When both proposals do this, you can see whether a higher total buys work the other builder considers optional, work the other builder considers unnecessary, or work the other builder did not mention at all. Whether the project should be divided into stages is a separate decision with its own page in this section.
What to compare besides the total
The published non-price factors
The Associated Pipe Organ Builders of America advises committees that the proposal offering the most pipes for the dollar may not be the best proposal, because the quality of materials, the workmanship, the location of the builder, and the service the instrument will need in the future also bear on the decision. This is purchasing advice from a trade association of builders, addressed to committees; it names no builder and is not a technical finding. The same purchasing guide recommends obtaining roughly three proposals, comparing the future service each builder offers, reviewing each builder’s client list, and taking up consultant references. The Diocese of Exeter’s 2016 guidance to its own parishes makes a similar recommendation, stating that reports and estimates should be obtained from organ builders and that in most cases two or three quotations should be sought.
Materials and workmanship can only be compared if each proposal identifies them, which is why the report checklist above matters before the totals are read. Future service is the factor most easily dropped from a comparison because it does not appear in the total, and it is the one APOBA singles out for a separate comparison.
Whether the cheapest proposal is the best one
Not necessarily, and the published guidance stops short of choosing for you. What it does is name the factors a total does not show — quality of materials, workmanship, the location of the builder, and the future service each builder offers — and ask that each of them be compared on its own before the totals decide anything.
Getting independent advice
An adviser’s report is not another builder’s proposal
An independent adviser’s report is a different document from the builders’ reports and proposals, and it comes from someone who is not competing for the work. The Diocese of Exeter guidance separates the two: it says reports and estimates should be obtained from organ builders, and that independent advisers may also submit a report with recommendations. The note does not say what an adviser’s report must contain or how the adviser is paid. The Organ Historical Society’s conservation guidelines, adopted in 2008 and framed for historically significant instruments, state that no individual can be expert in every aspect of organ conservation, and recommend collaboration with colleagues and allied professionals and the use of independent advisors to prevent conflicts of interest. That is guidance, not a standard binding on any firm.
Advice that does not displace a builder already involved
Independent advice does not have to push aside a builder who is already working with you. The Organ Clearing House, for example, describes itself as available to advise on any issue relating to a pipe organ, including condition and repair recommendations, and states that where another organbuilder is involved it is happy to rely on that builder’s judgment. That is one practitioner’s description of its own service, not a statement of general practice.
Where the scope is finally fixed
The accepted written document controls scope and price
At Craftsman Pipe Organs, scope and price are fixed by the written project documents for the work that is accepted, and preliminary discussions or ranges are not binding proposals, however specific they may have sounded at the time. A comparison should therefore be run on the written proposals as they would be accepted, with alternates, exclusions, and optional items resolved on paper, because the document you accept is the one that governs what is done.
The same precision that makes proposals comparable also makes the finished project documentable: a proposal that states scope, methods, and materials gives the owner a baseline against which the completed work and its records can be checked. The records an owner should receive, and how to read the condition report that comes before any proposal, are covered on their own pages in the Pipe Organ Restoration and Rebuilding section.
Frequently Asked Questions
Roughly three, according to the Associated Pipe Organ Builders of America’s purchasing guide, which also recommends comparing each builder’s future service, reviewing client lists, and taking up consultant references; the Diocese of Exeter’s 2016 guidance to its parishes says two or three quotations in most cases. Both are recommendations from bodies addressing their own constituencies, not requirements. Once you have the proposals, compare scope, methods, materials, essential-versus-optional work, and future service rather than totals alone.
Because two builders can reach different professional judgments about what the instrument needs. On the Austin Opus 323 project the supervising contractor said it was simpler to make all of the manual-motor valves and relays new than to try to repair them, a judgment specific to that instrument and project. To compare two proposals, look for each one to describe scope, what is required and why, methods and materials, and essential versus optional work, as IBO report guidance recommends; that guidance describes what a report’s recommendations should contain, not what any proposal must offer.
Not on price alone. The Associated Pipe Organ Builders of America advises committees that the proposal offering the most pipes for the dollar may not be the best one, because quality of materials, workmanship, the builder’s location, and future service also bear on the decision, and it recommends comparing future service and checking references. That is association purchasing advice addressed to committees and names no builder; it identifies the factors to weigh rather than choosing for you.
Guidance treats an adviser and the builders as separate sources. The Diocese of Exeter’s 2016 note distinguishes an independent adviser’s report from the organ builders’ reports and estimates, and the Organ Historical Society’s 2008 conservation guidelines recommend the use of independent advisors to prevent conflicts of interest. The diocesan guidance is written for its own parishes, and the OHS recommends an adviser rather than requiring one.
At Craftsman Pipe Organs, a quoted price is not binding until it is part of an accepted written document. Written project documents control the scope and price of accepted work; preliminary discussions or ranges are not binding proposals.